Concrete disposal in
Sterling Heights, Michigan.
Compare 4 roll-off dumpster companies for concrete disposal in Sterling Heights. Concrete is the heaviest common material at 4,000 lbs per cubic yard — the right size and disposal method saves hundreds.
Concrete is 4,000 lbs per cubic yard — the heaviest common material
A single cubic yard of concrete weighs 2 tons. A standard 10-yard dumpster with a 10-ton weight limit will max out at just 5 cubic yards of concrete. Order a 20 or 30 yard for concrete and you'll hit the weight cap with the bin barely a quarter full — and pay the same price. Stick with a 10-yard.
Recommended size for concrete in Sterling Heights
A 10-yard is the only practical size for concrete-only loads. At 4,000 lbs/yd³, you'll reach 10 tons (the standard weight limit) with just 5 cubic yards. Ordering a larger dumpster wastes money — the weight limit doesn't increase proportionally with the volume.
Concrete weight by volume
| Cubic Yards | Total Weight (lbs) | Total Weight (tons) |
|---|---|---|
| 1 yd³ | 4,000 lbs | 2.0 tons |
| 2 yd³ | 8,000 lbs | 4.0 tons |
| 3 yd³ | 12,000 lbs | 6.0 tons |
| 5 yd³ | 20,000 lbs | 10.0 tons |
Recycling vs landfill for concrete in Sterling Heights
Concrete recycling
$0–$5 per ton— concrete crushers turn old concrete into road base and aggregate. Many facilities accept clean concrete for free or nearly free.
Requirement:Clean concrete only. No rebar, no dirt, no trash, no painted surfaces mixed in. Some facilities accept concrete with rebar but charge $5–$15/ton extra for processing.
Landfill disposal
$50–$80 per ton— standard landfill tipping fees for concrete. A 10-ton load at $65/ton = $650 in disposal fees alone on top of the dumpster rental.
When it happens:Mixed loads (concrete + wood + trash) can't go to a recycler and default to landfill rates. Keep concrete separate to save $500+ on a typical load.
Pro tip:When booking, ask your hauler specifically about “clean concrete recycling rates.” Many haulers in Sterling Heights offer a lower flat rate for concrete-only loads they can send to a recycler instead of the landfill.
Concrete disposal cost comparison
| Disposal Method | Cost per Ton | 5-Ton Load | 10-Ton Load |
|---|---|---|---|
| Recycler (clean concrete) | $0–$5 | $0–$25 | $0–$50 |
| Recycler (concrete w/ rebar) | $5–$15 | $25–$75 | $50–$150 |
| Landfill (mixed load) | $50–$80 | $250–$400 | $500–$800 |
Costs shown are disposal/tipping fees only, separate from the dumpster rental price.
Unlock the lowest price
We found JM Junk Removal & Dumpster Rentals as the top-rated, best-value hauler in Sterling Heights. Enter your email to see their pricing and exclusive deals.
Free • No spam • Unsubscribe anytime
7370 19 Mile Rd, Sterling Heights, MI 48314, USA
42552 Sycamore Dr, Sterling Heights, MI 48313, USA
43807 Van Dyke Ave, Sterling Heights, MI 48313, USA
34841 Mound Rd suite 314, Sterling Heights, MI 48310, USA
Concrete disposal FAQ
What size dumpster do I need for concrete disposal in Sterling Heights?
A 10-yard dumpster is the standard for concrete disposal in Sterling Heights. Concrete weighs approximately 4,000 lbs per cubic yard, so even a 10-yard dumpster will reach the typical 10-ton weight limit with just 5 cubic yards of concrete. Larger dumpsters are not recommended because you'll hit the weight cap long before filling the volume.
Can I recycle concrete instead of sending it to a landfill in Sterling Heights?
Yes. Concrete recycling facilities in the Sterling Heightsarea accept clean concrete (no rebar, dirt, or trash mixed in) and crush it into aggregate for road base and fill. Recycling typically costs $0–$5 per ton compared to $50–$80 per ton at a landfill. Ask your hauler about recycling-rate loads when booking.
How much does concrete disposal cost in Sterling Heights, Michigan?
A 10-yard dumpster for concrete in Sterling Heightstypically costs $300–$550 for a 7-day rental with a 10-ton weight limit. Clean concrete-only loads that go to a recycler are often $100–$200 cheaper than mixed-debris loads sent to a landfill. Many haulers charge a premium for concrete, so always confirm the per-ton rate before booking.